Guide · Specifications and drawings · 07 53 23

Check EPDM roofing specifications against roof plans and details

UFGS Section 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing, a NAVFAC-prepared guide specification completely reviewed and reissued in August 2025, covers EPDM sheet roofing and its elastomeric flashing over insulation, a recovery board, or a concrete deck, on new and existing roofs with the insulation below the membrane. It offers three methods: fully adhered, the preferred norm, loose-laid ballasted with stone or pavers, and a combined system adhered in the field and mechanically fastened at the perimeter for extreme wind. Mechanical fastening in the field of the roof is prohibited. Its articles cover the sheet, seam tape, adhesives, flashing, fasteners, ballast, walkways, perimeter securement, drain sumps, and tests, and it leaves the deck, insulation, and sheet metal to other sections.

Start with the application method: confirm that the issued Section 07 53 23 keeps one method for each roof area, fully adhered, ballasted, or combined, that no plan note or detail shows membrane fasteners in the field of the roof, and that stone ballast is not drawn where the system note rules it out, such as along flight lines, in high wind, coastal, and open-water locations, and on critical facilities. Then check that the sheet type, adhesive, seam tape, perimeter and base tie-in securement, flashing, drain sumps, ballast or paver weights, walkways, and tests kept in the section match the roof plan, sections, and details, and that the deck, insulation, nailers, and sheet metal sit in Sections 07 22 00, 06 10 00, and 07 60 00.

Assemble the review package

Gather the roof plan with roof areas, slopes, crickets, drains, curbs, penetrations, walkways, equipment, and any ballast or paver areas, the roof sections showing the deck, insulation layers, cover board or recovery board, and membrane, the edge, parapet, wall, curb, expansion joint, drain, and penetration details, the structural deck drawings with the wind design criteria and perimeter and corner zones, the site plan showing any flight line, coastline, or open water near the building, the code analysis with the roof fire classification, the energy documents with the roof R-value, the mechanical and plumbing roof plans with exhausts, intakes, and kitchen or food service discharges, any existing-roof survey for a reroof, and the issued Section 07 53 23 with Sections 07 22 00, 07 60 00, and 06 10 00. Follow one roof area from the deck to the membrane and around its edges before assuming the others match.

WBDG publishes UFGS 07 53 23: Ethylene-Propylene-Diene-Monomer Roofing as a public guide-specification reference (accessed November 6, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Application method by roof areaDescription of Roof Membrane System[s] article and its designer note + Application Method plan submittal + Combined, Fully Adhered, Mechanically Fastened, and Ballasted Membrane Application articles + roof plan and roof sectionsWhere the roof plan has more than one deck, substrate, or use, is the second system paragraph repeated for each roof area, as the note directs, does each keep one method and one substrate, insulation, recovery board, or concrete deck, that matches the roof section, are the unused method paragraphs deleted, is the combined method kept only for the extreme, extended wind locations the note names, and is it clear that any field-of-roof fastening pattern in the Application Method plan is for the insulation, since the method articles do not permit membrane fasteners in the field?
Ballast and pavers against site and windDescription note on ballast limits + Ballast, Stone Ballast, Ballast Pavers, and Protection Mat articles and notes + Stone or Paver Ballast article and note + Roof Insulation Below EPDM Sheet note + site plan, roof plan, roof sections, and structural framingIs stone ballast kept off roofs along flight lines, in the high wind, coastal, and open-water locations, and on or next to critical facilities such as hospitals, with interlocking pavers in its place, as the note directs, does the roof plan or the section give the ballast or paver weight for the field and for the perimeter and corners, which the notes say to base on the wind design and ANSI/RMA/SPRI RP-4, has the structural engineer carried that dead load, and on a metal or precast deck, is the air barrier the note requires for a ballasted roof drawn, with the insulation fastened or adhered at the corners and perimeter?
Sheet, adhesive, and insulation compatibilityEPDM Sheet article and its note + Bonding Adhesive article and its note + opening note on insulation compatibility + Roof Insulation Below EPDM Sheet article and note + Section 07 22 00 + roof sectionsIs one sheet thickness kept, the heavier fleece-backed option where the project is hail-prone, as the note directs, with the total thickness blank filled in, does the bonding adhesive kept suit the fleece backing and the substrate in the roof section, with asphalt heating and application parameters like those in Section 07 51 13 added if hot asphalt is kept, as the note asks, is the membrane never fully adhered directly to polystyrene, perlite, or standard wood fiber, as the notes prohibit, and does the polyisocyanurate facer or cover board in Section 07 22 00 suit the adhesive?
Wind uplift, fire classification, and the roof plan drawingFire Resistance, Wind Uplift Resistance, and Qualification of Licensed Engineer articles and notes + Wind Uplift Calculations submittal note + Pre-roofing Conference roof plan drawing item + structural general notes, roof plan, and code analysisDoes the wind bracket kept point to loads indicated or to loads calculated to ASCE 7, are the calculated values delineated in the section or on the drawings, as the note asks, is the design wind speed blank filled in to match the structural notes, is the calculations submittal kept for a ballasted or non-rated system and the engineer paragraph for a non-rated one, as their notes direct, does the code analysis name an assembly with the fire classification and listing the section requires, and do the contract roof plans give every roof level, slope, and drain the contractor’s roof plan drawing must show?
Seams, perimeter, and base tie-insSeam Tape and Lap Splice Adhesive articles and notes + Tape Seams / Lap Splices and Adhesive Seams / Lap Splices articles and notes + Perimeter Attachment and Securement at Base Tie-In Conditions articles and their note + roof edge, wall, curb, and penetration detailsIs seam tape the field seaming method, with adhesive seams kept only in flashing areas unless the Government approves otherwise, as the notes require, do the edge, wall, curb, and penetration details show the membrane mechanically secured into nailers at the perimeter, at penetrations, and at every base tie-in and angle change the articles name, and where the perimeter is both adhered and fastened, is the adhesive boundary drawn to match the enhanced fastening zone, as the Perimeter Attachment article requires?
Flashing, nailers, and treated woodMembrane Flashings and Flashing Accessories, Flashing Tape, Wood Products, and Membrane Liner articles + Flashings General and Membrane Flashing articles and note + Examination nailer items + Section 07 60 00 + Section 06 10 00 + parapet, curb, and expansion joint detailsDo the details show the base flashing extended to the height the Membrane Flashing article requires, a termination bar under sheet metal counterflashing, a reglet within the range the Flashings article sets, and the membrane liner over exposed nailers and blocking, is cured EPDM flashing used except at the corners, scuppers, sealer pockets, and formed penetrations where uncured flashing is allowed, is fire-retardant-treated wood kept out of contact with the EPDM unless the manufacturer accepts it, as the Wood Products article requires, and has Section 07 60 00 been edited for an EPDM roof, as the flashing note asks?
Drains, sumps, and testsFlashing at Roof Drain article + Examination slope item + Roof Drain Test, Total Roofing Test, Concrete Moisture Testing, and Infrared Moisture Testing articles + roof plan, tapered insulation layout, plumbing roof drain plan, and Section 07 22 00Does the tapered insulation layout draw a sump at each drain within the slope the drain article allows for the reinforced or unreinforced sheet kept, does the sheet layout keep field seams out of the zone around each drain the article names, are retrofit drains on a reroof specified to ANSI/SPRI RD-1, is the drain test run before demolition as well as after roofing on a reroof, as the article describes, and are the concrete moisture and infrared tests kept where a concrete deck or wet existing insulation is a risk?
Walkways, set-on items, exhausts, PV, and fall protectionRubber Walkboards and Precast Concrete Paver Block articles and note + Roof Walkpads, Elevated Metal Walkways, Isolated Paver Blocks, Set-On Accessories, Lightning Protection, Photovoltaic Systems, and Fall Protection Systems articles + opening note on grease and exhaust + mechanical, plumbing, electrical, and PV roof plansAre walkways drawn at roof access points and on routes to equipment serviced as often as the walkway note describes, with protection under each set-on support, isolated paver, and elevated walkway post and no set-on accessory fastened through the membrane, is the fall protection paragraph filled in with the anchorages the roof plan shows, and is every kitchen or food service exhaust discharge kept off the EPDM or directed away from it, since the opening note says grease and oil attack EPDM and the section does not cover roofing next to those discharges?

Worked example: stone ballast on the flight line and field fasteners on the admin wing

Illustrative example: a new reserve training center beside an airfield apron has a steel roof deck with polyisocyanurate insulation, a ballasted EPDM roof over the drill hall, and a fully adhered EPDM roof over the administration wing. The issued Section 07 53 23 keeps stone ballast for the drill hall although the site plan puts the building on the flight line, the roof section shows no air barrier over the steel deck, neither the roof plan nor the section gives a ballast weight, a roof plan note on the administration wing calls for the membrane to be mechanically fastened in the field at an enhanced pattern, and the galley exhaust fan discharges straight onto the membrane.

Ask the architect and roof consultant to replace the stone ballast with interlocking pavers designed for the wind loads, or to change the drill hall to a fully adhered system, to add the air barrier over the steel deck if ballast stays, and to give the ballast or paver weights on the roof plan so the structural engineer can carry them as dead load. Ask the architect to remove the field fastening note and keep a fully adhered or combined system with perimeter fastening only, and ask the mechanical engineer and architect to direct the galley exhaust away from the roof or define a separate grease-resistant roof treatment around it, since Section 07 53 23 does not cover EPDM next to food service exhaust.

Avoid a false conflict

Section 07 53 23 covers the EPDM sheet, its flashing, adhesives, seam tape, fasteners, ballast, and walkways. Its opening note excludes the structural deck, insulation, sheet metal fascias, and gravel stops, so insulation, cover boards, and recovery boards follow Section 07 22 00 and the roof insulation guide, counterflashing and edge metal follow Section 07 60 00, nailers and treated wood follow Section 06 10 00, and roof drains follow the plumbing section; check those before calling a requirement missing. The section is for insulation below the membrane, so a protected membrane roof with insulation above it follows Section 07 55 00. TPO is Section 07 54 23 and the roofing membrane guide, modified bitumen is Section 07 52 00, and WBDG shows the older 07 53 00.00 40 and 07 55 23 sections as superseded by 07 53 23. The section points to UFC 3-110-03 Roofing, which its energy note cites for the ban on field fastening, and its quality control note asks for a registered roof consultant, engineer, or architect experienced in roofing on the design team for larger or mission-critical roofs. Wind uplift, ballast design, fire classification, and energy performance are decisions for the architect, the structural engineer, and the roof consultant. The current guide section cites ASCE 7-22, FM 4470, UL 790, ASTM D4637, D4811, D448, D4073, E108, E907, F2420, and C1153, ANSI/SPRI RD-1, ANSI/SPRI/FM 4435/ES-1, and the 2024 IBC, and its notes name ANSI/RMA/SPRI RP-4 for ballast; confirm the editions your project invokes.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should an EPDM roofing specification review compare?

Compare the application method by roof area, ballast and pavers against the site and wind, sheet, adhesive, and insulation compatibility, wind uplift, fire classification, and the roof plan drawing, seams, perimeter, and base tie-ins, flashing, nailers, and treated wood, drains, sumps, and tests, and walkways, set-on items, exhausts, PV, and fall protection.

Can an EPDM roof be mechanically fastened under UFGS 07 53 23?

Not in the field of the roof. The current UFGS 07 53 23 on WBDG offers a fully adhered system, the preferred norm, a loose-laid ballasted system, and a combined system that is fully adhered in the field and mechanically fastened at the perimeter, and its notes cite UFC 3-110-03 for the prohibition on field fastening. Every method still fastens the membrane to nailers at the perimeter and at penetrations. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How is this different from the TPO roofing membrane guide?

The roofing membrane guide compares UFGS 07 54 23 TPO roofing, a thermoplastic sheet, with roof plans and details. EPDM is an elastomeric sheet whose field seams Section 07 53 23 forms with seam tape, so this guide follows tape seams, adhesive limits, ballast, and perimeter securement. The insulation and cover boards under either membrane stay in the roof insulation guide for Section 07 22 00.

Can Groundbook check roof drawings against Section 07 53 23?

Groundbook compares the drawing set with the reference documents you upload, such as your issued Section 07 53 23, the related roofing sections, the existing-roof survey, and licensed codes or standards you hold, and links each potential disagreement to both sources. It has no built-in code library and does not calculate wind uplift or ballast weight, select a rated assembly, certify compliance, or design the roof. Each finding is a question for the architect, structural engineer, or roof consultant.

Keep exploring

Continue your review

Check roofing membrane specifications against drawings

Compare TPO roofing membrane scope, substrate, flashing, drainage, and warranty requirements across roof plans and specifications.

Explore

Check roof insulation specifications against roof plans and details

Compare roof insulation R-value, tapered layout, thermal barrier, wind attachment zones, vapor retarder, and nailers with UFGS 07 22 00.

Explore

Check flashing and sheet metal specifications against roof and wall details

Compare sheet metal choices, gutters and downspouts, copings, counterflashing and reglets, expansion joints, and roof edge wind uplift with UFGS 07 60 00.

Explore

UFC 3-110-03 Roofing review of DoD roof plans, details, and specifications

Review DoD roof drawings and specs against the reissued UFC 3-110-03: NRCA and MBMA basis, decks, cover boards, drainage, PV, and recover.

Explore

ASCE 7 design load criteria plan review

Review drawings against ASCE 7: design criteria notes, risk category, wind, snow, and seismic data, and loads for delegated design. With a published finding.

Explore

Check modified bitumen roofing specifications against roof plans and details

Compare SBS and APP plies, torch limits at wood curbs and nailers, base sheet, flashing, drains, walkpads, and wind and fire listings with UFGS 07 52 00.

Explore

Read the solar layout, electrical diagram and support together

Review a rooftop solar PV package for agreement across layout, equipment data, electrical diagrams and mounting details. Includes a coordination CSV.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.