We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Alabama

AI plan review in Alabama

First establish whether the Alabama project belongs in DCM’s review program. A school, hotel, or state-funded project can follow a different route from an ordinary private building; record that route before assembling the references.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Alabama

Examples of codes that can apply in Alabama. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Alabama reference guide

Establish who reviews what

Check the project category

Alabama’s Division of Construction Management describes jurisdiction over state property or funding, specified education projects, hotels, motels, and movie theaters. Its authority is not a blanket permit-review service for all private commercial or residential construction.

Alabama DCM: jurisdiction

Use DCM’s submission guidance when applicable

DCM’s FAQs direct applicants to upload submittal PDFs through its Engage Portal. They also direct residential-code questions to the Home Builders Licensure Board. Verify local requirements in addition to any applicable state review.

Alabama DCM: FAQs

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Alabama

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

Jurisdiction and funding

State the owner type, funding, use, and whether DCM confirmed jurisdiction. Include the appropriate DCM or local submission checklist.

School or specialty documents

For an education or other DCM project, bring the project manual and applicable agency guidance. Include shelter-related design documents if the project scope calls for them.

One coordinated submission

Supply current drawings, specifications, and prior DCM or local comments. Compare the stated scope and code basis across the cover sheet and consultant sets.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Alabama plan review FAQs

Does Alabama DCM review every private building?

No. DCM describes a defined jurisdiction, including certain private uses such as hotels, motels, theaters, and schools. Confirm your project category with DCM and identify the local department responsible for other permitting requirements.

Which documents should I supply for a Alabama AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Alabama permit set before you submit

Trusted by hundreds of professionals

Product screenshot