We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Louisiana

AI plan review in Louisiana

A Louisiana reference set should distinguish the state’s adopted construction codes from the review authority for each discipline. Record the applicable rule version and project scope before comparing code notes across consultant documents.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Louisiana

Examples of codes that can apply in Louisiana. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Louisiana reference guide

Establish who reviews what

Use the adopted rules, not a model-code assumption

Louisiana’s Uniform Construction Code Commission publishes current editions and amendments. Its August 2026 code sheet lists the current books separately from the next cycle and identifies January 1, 2027 for the next ICC-code editions.

Louisiana LUCCC: August 2026 code information

Check statutory scope and effective provisions

The Commission’s August 2026 rulebook covers municipal and parish enforcement, State Fire Marshal powers, and exemptions. Confirm each agency’s scope with the permitting authority rather than relying on an older statutory summary or exclusion list.

Louisiana LUCCC: August 2026 laws and rules

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Louisiana

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

Dated adoption package

List the adopted codes, applicable Louisiana amendments, and permit date, and supply written code-basis confirmation. Identify superseded references.

Discipline responsibility matrix

Record who reviews building, fire/life safety, accessibility, and trade scopes for the project. Include each applicable submission checklist.

Coordinated assembly evidence

Bring structural and envelope details, product documents, life-safety plans, MEP schedules, and the project’s site criteria. Check that references and specifications agree.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Louisiana plan review FAQs

Can I rely on an older Louisiana code-exclusion list?

Check the Commission’s current rulebook and code-information sheet first. They separate current references from the next cycle and describe enforcement and exemptions; confirm the actual project’s scope with the authority.

Which documents should I supply for a Louisiana AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Louisiana permit set before you submit

Trusted by hundreds of professionals

Product screenshot