A Louisiana reference set should distinguish the state’s adopted construction codes from the review authority for each discipline. Record the applicable rule version and project scope before comparing code notes across consultant documents.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for Louisiana
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Select each discipline’s applicable edition from the Commission’s code information; add the relevant state amendments.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
Louisiana reference guide
Establish who reviews what
Use the adopted rules, not a model-code assumption
Louisiana’s Uniform Construction Code Commission publishes current editions and amendments. Its August 2026 code sheet lists the current books separately from the next cycle and identifies January 1, 2027 for the next ICC-code editions.
The Commission’s August 2026 rulebook covers municipal and parish enforcement, State Fire Marshal powers, and exemptions. Confirm each agency’s scope with the permitting authority rather than relying on an older statutory summary or exclusion list.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for Louisiana
Use this preparation list for Groundbook alongside the official permit checklist.
Dated adoption package
Supply the adopted code list, applicable Louisiana amendments, permit date, and written code-basis confirmation. Identify superseded references.
Discipline responsibility matrix
Record who reviews building, fire/life safety, accessibility, and trade scopes for the project. Include each applicable submission checklist.
Coordinated assembly evidence
Bring structural and envelope details, product documents, life-safety plans, MEP schedules, and the project’s site criteria. Check that references and specifications agree.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Can I rely on an older Louisiana code-exclusion list?
Check the Commission’s current rulebook and code-information sheet first. They separate current references from the next cycle and describe enforcement and exemptions; confirm the actual project’s scope with the authority.
Which documents should I supply for a Louisiana AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.