For Connecticut, record the permit application date with the reference set. The state’s code directory distinguishes editions by filing period, making that date useful when reviewing an older permit or a newly submitted package.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for Connecticut
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Use the model editions incorporated into that Connecticut code package; identify the relevant discipline and building scope.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
Connecticut reference guide
Establish who reviews what
Establish the filing-period edition
Connecticut’s Office of the State Building Inspector identifies the 2022 State Building Code for applications filed from October 1, 2022 and lists earlier filing periods separately. Confirm the governing basis with the reviewing official.
The published Connecticut code includes amendments by discipline and Errata #1. Use those amendments with the referenced model codes, and obtain the receiving department’s current forms and submission checklist.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for Connecticut
Use this preparation list for Groundbook alongside the official permit checklist.
Application and amendment record
Include the filing date, applicable state-code edition, errata, and the official’s code-basis confirmation.
Discipline references
Bring the relevant Connecticut amendments alongside building, residential, energy, mechanical, plumbing, and electrical references for the selected scope.
Responses and revised drawings
For an existing application, supply the comment log and current consultant issue. Ask reviewers to trace each response into the affected plans, details, and schedules.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
The state lists code editions by permit-filing period. Record that date and confirm the project’s governing edition before comparing a previously filed design against a newer reference set.
Which documents should I supply for a Connecticut AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.