We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Connecticut

AI plan review in Connecticut

For Connecticut, record the permit application date with the reference set. The state’s code directory distinguishes editions by filing period, making that date useful when reviewing an older permit or a newly submitted package.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Connecticut

Examples of codes that can apply in Connecticut. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Connecticut reference guide

Establish who reviews what

Establish the filing-period edition

Connecticut’s Office of the State Building Inspector identifies the 2022 State Building Code for applications filed from October 1, 2022 and lists earlier filing periods separately. Confirm the governing basis with the reviewing official.

Connecticut DAS: building-code regulations

Pair amendments with the model books

The published Connecticut code includes amendments by discipline and Errata #1. Use those amendments with the referenced model codes, and obtain the receiving department’s current forms and submission checklist.

Connecticut: 2022 code with Errata #1

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Connecticut

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

Application and amendment record

Include the filing date, applicable state-code edition, errata, and the official’s code-basis confirmation.

Discipline references

Name the relevant Connecticut amendments and the building, residential, energy, mechanical, plumbing, and electrical codes for the selected scope.

Responses and revised drawings

For an existing application, supply the comment log and current consultant issue. Ask reviewers to trace each response into the affected plans, details, and schedules.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Connecticut plan review FAQs

Why does the Connecticut application date matter?

The state lists code editions by permit-filing period. Record that date and confirm the project’s governing edition before comparing a previously filed design against a newer reference set.

Which documents should I supply for a Connecticut AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Projects in more than one state

More New England plan review guides

For another project's location, start with its own authority and reference list. Requirements and adopted editions can differ across state lines.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Connecticut permit set before you submit

Trusted by hundreds of professionals

Product screenshot