We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Maine

AI plan review in Maine

In Maine, code applicability and municipal enforcement are different questions. Identify the project’s MUBEC requirements and local review arrangements, then add the separate plumbing, electrical, and fire references relevant to the work.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Maine

Examples of codes that can apply in Maine. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Maine reference guide

Establish who reviews what

Use the current agency resource

Maine’s Office of Community Affairs now hosts the Division of Building Codes and Standards. Its guidance states that MUBEC compliance remains the owner’s responsibility even in municipalities that do not enforce it.

Maine MOCA: Building Codes and Standards

Build a complete reference set

MOCA directs readers to the MUBEC rules for editions and amendments, and to separate professional-regulation and Fire Marshal resources for trade and fire standards. A MUBEC reference alone may not cover every discipline.

Maine MOCA: Building Codes and Standards

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Maine

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

Municipal review arrangement

Provide the municipality, enforcement or inspection arrangement, and local submission checklist, and name the confirmed applicable codes.

MUBEC and separate standards

Name the relevant MUBEC amendments with their base codes, plus the plumbing, electrical, and fire codes selected for the scope.

Envelope and systems coordination

Include energy documentation, enclosure details, equipment and ventilation schedules, and existing-building information. Ask reviewers to compare the stated requirements across documents.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Maine plan review FAQs

Does a Maine municipality’s lack of MUBEC enforcement remove the owner’s obligation?

MOCA says compliance remains the building owner’s responsibility regardless of whether the municipality enforces MUBEC. Confirm the applicable requirements and inspection arrangements for the project.

Which documents should I supply for a Maine AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Projects in more than one state

More New England plan review guides

For another project's location, start with its own authority and reference list. Requirements and adopted editions can differ across state lines.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Maine permit set before you submit

Trusted by hundreds of professionals

Product screenshot