Construction documents · Indiana

AI plan review in Indiana

For Indiana, establish whether the work requires a state filing as a Class 1 structure. Keep the state design-release scope and local permit package linked so neither the project team nor the AI review assumes one approval covers every requirement.

Your codes, connected to your drawings

Bring your own code PDFs

Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.

  1. Add your references

    Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.

  3. Review the findings

    Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four California Title 24 code PDFs set to Code and Use as reference, and a drawing set marked Check this file.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs

State and local references

Code references for Indiana

Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.

Indiana reference guide

Establish who reviews what

Determine Class 1 filing applicability

Indiana DHS directs Class 1 structures to building plan review and provides guidance on exemptions. Use the official process to confirm classification before selecting the submission documents.

Indiana DHS: Building Plan Review

Choose the appropriate application package

DHS publishes project-specific submittal guidance and a plan-review process. Plumbing, electrical, hood, or other system information may be needed depending on the work; check the relevant checklist and local intake requirements.

Indiana DHS: review process

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Indiana

Use this preparation list for Groundbook alongside the official permit checklist.

Classification and scope

Provide the project use, occupancy, area, work description, and state filing determination. Include the applicable design-release checklist.

Discipline package

Supply the required architectural, structural, plumbing, electrical, mechanical, and fire-system PDFs. Clearly identify systems submitted separately.

State and local responses

Include design-release comments and local review comments in one indexed record. Ask reviewers to trace each response across all affected consultant sheets.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Indiana plan review FAQs

Does every Indiana building follow the Class 1 filing route?

No. Confirm the statutory classification and any filing exemptions using DHS guidance. Record the state filing decision and the local permit requirements as separate parts of the project scope.

Which documents should I supply for a Indiana AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and San Francisco

Review the set before you submit

Bring your drawings and the references that govern the project.

Product screenshot