Identify Michigan’s enforcing agency for each discipline before assembling a review package. Keep building, trade, and any specialized state review scopes visible so the current drawing set can be checked against the right references.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for Michigan
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Include the trade references relevant to the review; confirm whether residential provisions are covered by the residential code.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
Michigan reference guide
Establish who reviews what
Confirm state enforcement jurisdiction
Michigan LARA’s Bureau of Construction Codes reviews building and trade plans where the state has enforcement authority. Confirm whether the bureau or a local enforcing agency receives the project’s submission.
LARA’s guidance separately includes barrier-free design exception requests, mobile-home park plans, and premanufactured-unit documentation. Include the relevant determination or approval when one of these scopes affects the building design.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for Michigan
Use this preparation list for Groundbook alongside the official permit checklist.
Enforcing-agency matrix
Name the reviewer for each discipline, its current code edition, and the applicable permit checklist. Do not assign a single edition based only on a drawing cover-sheet label.
Special approvals
Bring applicable barrier-free exception decisions, premanufactured-unit information, or other agency conditions. Clearly distinguish requested exceptions from approvals.
Coordinated building and trades
Supply current building, mechanical, plumbing, electrical, and relevant equipment documents. Reconcile penetrations, access, clearances, and schedules across the set.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Does Michigan LARA receive every local building permit review?
Its plan-review guidance applies where the state has enforcement authority and also describes specific specialized reviews. Confirm the enforcing agency for each part of your project before submitting.
Which documents should I supply for a Michigan AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.