We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Michigan

AI plan review in Michigan

Identify Michigan’s enforcing agency for each discipline before assembling a review package. Keep building, trade, and any specialized state review scopes visible so the current drawing set can be checked against the right references.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Michigan

Examples of codes that can apply in Michigan. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Michigan reference guide

Establish who reviews what

Confirm state enforcement jurisdiction

Michigan LARA’s Bureau of Construction Codes reviews building and trade plans where the state has enforcement authority. Confirm whether the bureau or a local enforcing agency receives the project’s submission.

Michigan LARA: Plan Review

Identify specialized state reviews

LARA’s guidance separately includes barrier-free design exception requests, mobile-home park plans, and premanufactured-unit documentation. Include the relevant determination or approval when one of these scopes affects the building design.

Michigan LARA: Plan Review

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Michigan

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

Enforcing-agency matrix

Name the reviewer for each discipline, its current code edition, and the applicable permit checklist. Do not assign a single edition based only on a drawing cover-sheet label.

Special approvals

Bring applicable barrier-free exception decisions, premanufactured-unit information, or other agency conditions. Clearly distinguish requested exceptions from approvals.

Coordinated building and trades

Supply current building, mechanical, plumbing, electrical, and relevant equipment documents. Reconcile penetrations, access, clearances, and schedules across the set.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Michigan plan review FAQs

Does Michigan LARA receive every local building permit review?

Its plan-review guidance applies where the state has enforcement authority and also describes specific specialized reviews. Confirm the enforcing agency for each part of your project before submitting.

Which documents should I supply for a Michigan AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Projects in more than one state

More Great Lakes plan review guides

For another project's location, start with its own authority and reference list. Requirements and adopted editions can differ across state lines.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Michigan permit set before you submit

Trusted by hundreds of professionals

Product screenshot