Wisconsin’s commercial-building review can involve DSPS or a delegated municipality, with specific limits on the delegated scope. Identify the building and review category before choosing the checklist and documents.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for Wisconsin
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Include the applicable energy reference with Wisconsin provisions and the project’s energy documentation.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
Wisconsin reference guide
Establish who reviews what
Check commercial-program applicability
DSPS describes review of public buildings and places of employment, including multifamily buildings. Its commercial page provides plan-review categories, checklists, and code templates; confirm whether that program fits the project.
DSPS publishes a delegated-authority list for commercial structural and HVAC review with scope conditions and exceptions. Confirm the actual delegation rather than assuming all disciplines or building sizes are covered locally.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for Wisconsin
Use this preparation list for Groundbook alongside the official permit checklist.
Program and delegation record
Provide the building use, relevant size information, responsible reviewer, and the municipality’s applicable delegation scope.
Checklist and code template
Include the current DSPS or local submission checklist, code-analysis template, governing references, and any required variance decision.
Building/HVAC/system package
Supply architectural and structural drawings, mechanical plans, energy documents, fire-system information, and schedules. Label separately reviewed systems and reconcile their interfaces.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Does Wisconsin municipal delegation cover every discipline and building?
Verify the specific delegation. DSPS publishes scope conditions and exceptions for commercial structural and HVAC review; the locality’s presence on a list does not establish unlimited authority over the entire project.
Which documents should I supply for a Wisconsin AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.