Guide · Specifications and drawings · 34 60 13

Check EV charging specifications against site plans, panel schedules, one-line diagrams, and charge management strategies

UFGS Section 34 60 13 Electric Vehicle Charging Facility (EVCF), a NAVFAC-prepared guide specification issued in August 2024 as a complete update that renumbered and retitled the former Section 11 11 37 Electric Vehicle Supply Equipment, covers the conductors, connectors, chargers, and other equipment installed to transfer energy from premises wiring to electric vehicles. The DoD uses EVCF for the real property in place of the industry term EVSE. The section specifies Level 1, Level 2, and DC fast chargers, output cables and connectors, enclosures, non-network and network connected charge management systems with their protocols and connectivity, accessories, concrete pads, nameplates, pavement markings, signage, and wheel stops or bollards, then installation, grounding, wiring, foundations, training, and acceptance checks and tests.

Start with the site plan, the electrical plans, and the issued Section 34 60 13: confirm that the drawings locate each charger and its parking space, give the charger level, input voltage and phase, ports, and mounting the section leaves blank, show the circuits and any load management that lets several ports share a circuit, and state the EVCF Control Strategies the charge management paragraph says are in the project plans. Then check enclosures, pads, markings, signs, and wheel stops against the site details, and resolve the section’s missing submittal paragraph, temperature and surge rating misprints, phase conflict for Level 2, and protocol label.

Assemble the review package

Gather the site and parking plans with the charging spaces, the electrical site plan with conduit, handholes, and pads, the one-line diagram and panel schedules feeding the chargers, any load calculation or transformer capacity study, the EVCF control strategies or sequence for charge management, the communications drawings for network or cellular connections, the details for pads, bollards, wheel stops, pavement markings, and signs, the project’s Environmental Severity Classification from UFC 1-200-01, and the issued Section 34 60 13 with Sections 26 20 00, 33 71 02, 32 17 23.16, 25 05 11, 26 08 00, and the seismic sections if they apply. Follow one charger from its panel breaker to its pad, enclosure, connector, and network before assuming the others match.

WBDG publishes UFGS 34 60 13: Electric Vehicle Charging Facility (EVCF) as a public guide-specification reference (accessed November 15, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
What the drawings must showInstallation Drawings (location as proposed in the design drawings; layout, dimensions, clearances, mounting, communications, conduits, meters, single-line diagrams of power, communications, and control wiring) + Network Connected Charge Management System (“EVCF Control Strategies in the project plans”) + Equipment Enclosure note (designer coordinates NEMA designation on the drawings) + Seismic Requirements note (Government designer puts seismic requirements on the drawings) + Foundation note (slab construction only if not detailed) + site, electrical, and communications plansDo the site and electrical plans locate every charger, its space, and its pad, does a sheet or the specification state the EVCF Control Strategies the charge management paragraph relies on, do the drawings give the enclosure NEMA type, and are seismic and foundation details either drawn or left to the section deliberately?
Charger levels, voltage, phase, and powerDefinitions (Level 1; Level 2 with single-phase input; DC fast charger with three-phase input) + Conductive Plug-in System Description (one or multiple vehicles; surge protection voltage rating default printed in kV) + Level 1 Plug-in EVCF (a 230 V option, while the Level 1 note sizes chargers at 120 V) + Level 2 Plug-in EVCF (three-phase input options the definition does not describe) + DC Fast Charger EVCF + notes (NEC Articles 625, 210, and 240 for conductors and overcurrent protection) + panel schedules and one-line diagramDoes each charger type on the drawings match a level the issued section keeps, with its input voltage, phase, amps, and kilowatts filled in to agree with the panel schedule, has the specifier settled whether Level 2 chargers are single-phase or three-phase, and has the surge protection voltage rating been entered in the intended unit?
Circuits, load management, and charge managementCharge Management System notes (dedicated circuits; multiple chargers on one circuit only with an energy management system under NFPA 70; publicly accessible chargers need a network connected system; non-network chargers behind a secure fence line) + Non-Network Connected Charge Management System (port quantity blank; no data) + Energy Load Management (static or programmable) + Network Connected Charge Management System (control strategies; access control, payment, load management, monitoring, and reporting brackets) + Vendor Requirements (J&A only) + panel schedules and site planWhere the panel schedule puts several ports on one circuit, is an energy load management option kept and described in the control strategies, are publicly accessible chargers served by a network connected system, are non-network chargers inside a secured lot on the site plan, and if a vendor is named, is the J&A in place and the configuration settings attached or drawn?
Network, protocols, and cybersecurityRelated Requirements (Section 25 05 11) + Network Connected note (a version of Section 25 05 11 edited for the EVCF) + Communication Protocols (OCPP item labelled “Charger-to-Charger” while the note describes chargers to the charging network; OCPI; ISO 15118 parts) and note (OCPP 2.0.1 expected by March 2024) + Network Connectivity (cellular, Wi-Fi, Ethernet, backup) + Wireless Survey bracket + Testing of Electric Vehicle Control Network + communications drawingsIs a version of Section 25 05 11 edited for the chargers in the project manual, has the specifier relabelled the OCPP item and chosen the OCPP and ISO 15118 versions with current market availability in mind, and do the communications drawings show how each charger reaches the network, with a wireless survey kept where cellular service is relied on?
Cables, connectors, enclosures, and operating conditionsOutput Cable (UL 62 or UL 2263; length blank) and note (maximum length unless part of a listed cable management system, NFPA 70 Article 625) + Plug Connectors (CONUS and OCONUS connector type brackets) and note + Connector Holster Dock (temperature range with the inch-pound low end missing its minus sign) + Equipment Enclosure (NEMA 3R or 4X by Environmental Severity Classification) + Operating Conditions (ambient range printed the same way; humidity; altitude; sun shade or enclosure bracket) + AccessoriesDo the cable length and cable management choice suit the distance from charger to vehicle inlet on the parking layout, are the connector types chosen for the vehicles and location the project serves, does the enclosure type match the project’s corrosion classification, and has the specifier corrected the inch-pound low temperature and decided whether a sun shade or enclosure is needed?
Pads, markings, signs, wheel stops, and bollardsCast-In-Place Concrete (two alternative paragraphs; Section 03 30 00) + Foundation for Equipment, Exterior Location (pedestal units on a slab unless otherwise indicated; flush in pavement, raised in turf; conduit turnups) + Pavement Markings (Section 32 17 23.16) and note + EVCF Signage (MUTCD and base standards; MUTCD not in References) + Wheel Stops and Bollards (where existing curbing is not present) + site detailsDo the site details show a pad for each pedestal charger or defer to the section deliberately, do the pavement marking and signing plans cover the charging spaces with the restrictions the section requires, are wheel stops or bollards drawn wherever no curb protects a charger, and do the parking layout and pads leave the clearances and accessible routes the project’s adopted criteria require?
Grounding, wiring, seismic, and related sectionsRelated Requirements (Sections 26 20 00, 33 71 02, 32 17 23.16, 25 05 11, and 26 08 00 apply) + Product Coordination (non-EVCF products under those sections; EVCF equipment listed) + Seismic Requirements (Sections 13 48 73 and 26 05 48; Air Force and Army) + Installation (IEEE C2 bracket, NFPA 70) + Grounding (for a new service; cites “ANSI/IEEE 142”; resistance limit) + Grounding Electrodes (Section 33 71 02) + Wiring and Conduit (Sections 26 20 00 and 33 71 02)Are all five related sections in the project manual, does the one-line diagram show whether the chargers get a new service, which decides whether the grounding paragraph applies, are ground rods and conductors detailed under Section 33 71 02, and where seismic requirements apply, are the seismic sections edited and included?
Submittals, testing, training, and closeoutSubmittals (“paragraph COORDINATED SUBMITTAL REVIEWS herein”, which does not exist; bracketed items matching bracketed paragraphs) + Certified Installers + Warranty brackets + Operation and Maintenance Manuals and Spare Parts (no submittal item) + Testing of Electric Vehicle Charging Facility + Performance of Acceptance Checks and Tests (insulation resistance per NETA ATS, not in References; load sharing current limit; transformer capacity; alarms; data interface) + Training (after “the Performance Tests have been approved”, a paragraph the section does not have) + Record Documentation (Air Force and Army)Has the specifier removed or written the coordinated submittal review paragraph, added NETA ATS to the References or named another test standard, tied the training start to the Field Quality Control tests, and kept only the submittal items that match the brackets kept, and does the one-line diagram give the transformer the tests will check?

Worked example: a fleet charging lot with shared circuits and no control strategy sheet

Illustrative example: a vehicle maintenance facility adds eight Level 2 ports for government fleet vehicles and two DC fast chargers open to personal vehicles. The issued Section 34 60 13 keeps both charge management options, keeps every Level 2 voltage option, and leaves the surge rating default as printed. The panel schedule puts two Level 2 ports on each circuit, the site plan shows the fleet chargers outside the secured lot, no sheet states the EVCF Control Strategies, the enclosure is not designated although the base is near the coast, and the pavement marking plan omits the charging spaces.

Ask the electrical engineer to add the control strategies, including the load management that allows two ports per circuit, to choose single-phase or three-phase Level 2 chargers to match the panel, and to designate the enclosure type from the project’s Environmental Severity Classification. Ask the civil designer to add the spaces to the marking and signing plans and to place the fleet chargers inside the secured lot or switch them to network management. Ask the specifier to keep one charge management option per charger group, to correct the surge rating unit and temperature misprints, and to resolve the submittal and training references.

Avoid a false conflict

Section 34 60 13 covers the charging equipment, charge management, and site items specific to EV charging. Interior distribution follows Section 26 20 00, site distribution, duct banks, and ground rods follow Section 33 71 02 and the underground electrical guide, markings follow Section 32 17 23.16, cybersecurity follows Section 25 05 11, acceptance testing follows Section 26 08 00 and its guide, and NFPA 70 Article 625, the adopted building and accessibility codes, and state or local EV requirements govern design, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the Submittals article points to a coordinated submittal review paragraph that does not exist, two inch-pound temperature ranges drop a minus sign, the surge rating default is printed in kV, the Level 2 definition and paragraph disagree on phase, the OCPP item is labelled charger to charger, two cited documents are missing from the References article, and training waits on a performance test paragraph the section does not have. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should an EV charging specification review compare?

Compare what the drawings must show, charger levels, voltage, phase, and power, circuits, load management, and charge management, network protocols and cybersecurity, cables, connectors, enclosures, and operating conditions, pads, markings, signs, wheel stops, and bollards, grounding, wiring, seismic, and related sections, and submittals, testing, training, and closeout.

What must the drawings show under UFGS 34 60 13?

The current UFGS 34 60 13 Electric Vehicle Charging Facility (EVCF) on WBDG locates chargers “as proposed in design drawings”, operates network connected charge management by the “EVCF Control Strategies in the project plans”, and asks the designer to coordinate the enclosure NEMA type on the drawings, so the site, electrical, and communications drawings need to carry the charger locations, circuits, control strategies, and enclosure types. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How is this different from the CALGreen and NFPA 70 pages?

The CALGreen page checks whether a California project provides the EV spaces and infrastructure its checklist claims, and the NFPA 70 page covers the electrical code. UFGS 34 60 13 is a DoD guide specification for the charging equipment itself: charger levels, charge management, protocols, enclosures, pads, markings, and tests. It replaced UFGS 11 11 37 Electric Vehicle Supply Equipment in August 2024.

Can Groundbook check EV charging drawings against Section 34 60 13?

Groundbook compares the drawing set with the specification sections and reference documents you upload, such as your issued Section 34 60 13, the electrical distribution, pavement marking, and cybersecurity sections, charger submittals, and licensed codes and standards you hold, and returns potential conflicts with links to the source pages. It has no built-in code library and does not design circuits or load management, calculate loads, voltage drop, or transformer capacity, certify compliance, or approve submittals. Each finding is a question for the electrical engineer, the civil designer, the specifier, or the contracting officer.

Keep exploring

Continue your review

Check interior electrical distribution specifications against drawings

Compare panel schedules, feeders, conductors, raceways, grounding, and fire pump and emergency circuits across electrical drawings and UFGS 26 20 00.

Explore

Check underground electrical distribution specifications against drawings

Compare duct banks, direct burial, cable types, manholes and handholes, terminations, building feeders, grounding, and tests with UFGS 33 71 02.

Explore

Check electrical acceptance testing specifications against drawings

Compare the equipment list, NETA testing, procedures, reports, and energization in UFGS 26 08 00 with the one-line and equipment sections.

Explore

NFPA 70 National Electrical Code plan review

Review electrical drawings against NFPA 70 (NEC) across one-lines, panel schedules, equipment, rooms, and other trades. See checks and AI review limits.

Explore

CALGreen (Title 24, Part 11) green building code plan review

Check CALGreen mandatory measures and tier checklists against the drawings: EV charging, water use, waste, and indoor air under the 2025 Title 24, Part 11.

Explore

Check electrical seismic protection specifications against drawings

Compare seismic criteria, electrical component lists, who designs supports, raceway joints, light fixtures, anchors, and inspection with UFGS 26 05 48.

Explore

Check power system study specifications against drawings

Check that the studies UFGS 26 05 73 requires cover the sources, equipment, devices, and names on the one-line, schedules, and arc flash label details.

Explore

Check concrete curb, gutter, and sidewalk specifications against site and paving plans

Compare sidewalk thickness and slope, curb and gutter sections, joint layout, detectable warnings, subgrade, curing, and tolerances with UFGS 32 16 19.

Explore

Electrical drawing review checklist

Review electrical one-lines, panel schedules, equipment loads, circuit references, and lighting controls. Includes a worked example and a free CSV.

Explore

Check VRF HVAC specifications against equipment schedules, refrigerant piping plans, and controls points schedules

Compare VRF system type, outdoor and indoor unit schedules, refrigerant safety, controls, branch selectors, and testing with UFGS 23 81 29.

Explore

Check road and parking lot pavement marking specifications against striping plans, marking legends, and paving plans

Compare striping plans, marking legends, paint and bead types, raised markers, and removal of old markings with UFGS 32 17 23.16.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.

Explore

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your EV charging facility specs against the drawings

Trusted by hundreds of professionals