We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Florida

AI plan review in Florida

Keep the Florida code edition, later supplements, and the local submission package aligned. For envelope and structural reviews, include the project’s selected product documents and design criteria so reviewers can trace what the drawings actually specify.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Florida

Examples of codes that can apply in Florida. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Florida reference guide

Establish who reviews what

Separate an effective code from development work

The Florida Building Commission identifies December 31, 2023 as the effective date of the 8th Edition (2023). Its site separately links the 2026 update. A development document is not evidence that a future edition governs the permit.

Florida Building Commission: code portal

Use the applicable supplements

The Commission’s resource directory lists supplements to the 8th Edition alongside 9th Edition change analyses. Select the applicable code and supplements with the local building department, which also supplies the project’s intake requirements.

Florida Building Commission: code resources

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Florida

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

A dated Florida code basis

List the governing edition, applicable supplements, permit scope, and local requirements. Keep proposed next-edition material clearly separate from governing references.

Envelope and product evidence

Supply relevant product-approval documents, opening and roofing schedules, installation details, and the engineer’s wind criteria. Ask the team to verify that each referenced assembly matches its intended location and conditions.

Permit and site requirements

Include the local submission checklist, flood or site criteria supplied for the project, energy documentation, and architectural/structural/MEP PDFs. Identify any specialty reviews still pending.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Florida plan review FAQs

Should I include 2026 code-development documents in a Florida permit review?

Use the code edition and amendments confirmed for your application. If you also want to study a future change, label that as a separate comparison and identify its status. The presence of 2026 development material does not establish that it is already effective.

Which documents should I supply for a Florida AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Florida permit set before you submit

Trusted by hundreds of professionals

Product screenshot