We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Maryland

AI plan review in Maryland

Maryland’s state adoption and a jurisdiction’s implementation date are separate checkpoints. Capture both, and identify whether the building falls under a special code category before setting up the reference comparison.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Maryland

Examples of codes that can apply in Maryland. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Maryland reference guide

Establish who reviews what

Confirm local implementation

Maryland Labor describes a two-step adoption process, with local jurisdictions given time after state adoption to implement the new codes. It directs applicants to the specific local jurisdiction for its adoption status.

Maryland Labor: state building codes

Check the building category

The state’s code matrix distinguishes project types, including modular and state-owned or state-used buildings under the Model Performance Code. The Building Performance Standards also have limits on local changes to energy and accessibility requirements.

Maryland Labor: Building Performance Standards

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Maryland

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

Local adoption record

Record the local effective date, code editions, and permitted amendments, and supply the submission checklist. State the application date being used.

Building-category confirmation

Identify whether the project is site-built, modular, state-owned, or state-used and include the authority’s determination of the governing standards.

Energy/accessibility coordination

Name the applicable energy and accessibility codes, and add reports, schedules, and plans. Compare common values and design assumptions across discipline documents.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Maryland plan review FAQs

Does Maryland state adoption immediately establish every local submission’s code basis?

Confirm the local implementation date. Maryland Labor describes a state-adoption step followed by local implementation and directs applicants to the local jurisdiction for its current status.

Which documents should I supply for a Maryland AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Maryland permit set before you submit

Trusted by hundreds of professionals

Product screenshot