We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · North Carolina

AI plan review in North Carolina

For North Carolina, check the effective-date notice before choosing the reference edition. A code listed in an adoption or rulemaking section should not automatically become the basis for reviewing a permit package.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for North Carolina

Examples of codes that can apply in North Carolina. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

North Carolina reference guide

Establish who reviews what

Check current and transition notices

OSFM maintains a current-and-past code directory with a separate 2024-code section and effective-date correspondence. Confirm the application’s governing edition using the current notice and the permitting official’s determination.

North Carolina OSFM: current and past codes

Include interpretations and amendments

OSFM’s code portal links state-code information and interpretations. Name the applicable approved amendments and relevant official interpretations alongside the local submission requirements for the work.

North Carolina OSFM: code portal

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for North Carolina

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

Confirmed code basis

Record the permit date, governing edition, and any transition determination. Keep proposed or future-effective materials separate.

Amendments and interpretations

Name the approved North Carolina amendments and official interpretations relied on by the designer. Identify the exact scope of each reference.

Local permit package

Bring the receiving jurisdiction’s checklist, life-safety analysis, consultant drawings, schedules, and previous comments. Compare the stated code basis across the entire set.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

North Carolina plan review FAQs

Should I choose a North Carolina code only because a newer edition appears online?

No. OSFM separates code resources from effective-date notices. Confirm which edition and amendments govern the application, then label future-edition studies separately from the permit review.

Which documents should I supply for a North Carolina AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your North Carolina permit set before you submit

Trusted by hundreds of professionals

Product screenshot