We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Virginia

AI plan review in Virginia

For Virginia, identify which part of the Uniform Statewide Building Code governs the work. New construction, an alteration, and maintenance can call for different reference paths even when they involve the same property.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Virginia

Examples of codes that can apply in Virginia. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Virginia reference guide

Establish who reviews what

Select the appropriate USBC part

Virginia DHCD identifies three USBC parts: Construction, Existing Building, and Maintenance. Establish the project’s scope before selecting references and interpreting information absent from an older building set.

Virginia DHCD: USBC overview

Use the local enforcement process

DHCD explains that the Board of Housing and Community Development adopts and amends the USBC while local building-inspection departments enforce it. Use state references with the local department’s submission checklist.

Virginia DHCD: USBC overview

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Virginia

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

Work classification and code basis

State the applicable USBC part, edition, and permit scope, and supply the local official’s determination for alterations or changes of use.

Existing/proposed documentation

Bring existing-condition surveys or reports, demolition plans, proposed drawings, and affected schedules. Identify unverified conditions.

Local review and responses

Include the local checklist, agency comments, energy documents, and coordinated consultant issue. Trace each required correction through all affected sheets.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Virginia plan review FAQs

Is the Virginia Existing Building Code interchangeable with the new-construction code?

They are distinct parts of the USBC. Confirm the applicable path for the work and supply the existing-condition and proposed-work information needed to support that choice.

Which documents should I supply for a Virginia AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Virginia permit set before you submit

Trusted by hundreds of professionals

Product screenshot