Can a factory-built plan package stand in for the Arizona site drawings?
Treat the off-site building and the site work as connected scopes. Include both packages, identify the responsible reviewers, and verify foundations, services, and placement against the local requirements and manufacturer’s information.
Which documents should I supply for a Arizona AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.