Construction documents · Arizona

AI plan review in Arizona

An Arizona package should identify the site jurisdiction and whether any part of the building is factory-built. Keep the local site requirements and the off-site construction documents connected without assuming they follow the same approval path.

Your codes, connected to your drawings

Bring your own code PDFs

Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.

  1. Add your references

    Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.

  3. Review the findings

    Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four California Title 24 code PDFs set to Code and Use as reference, and a drawing set marked Check this file.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs

State and local references

Code references for Arizona

Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.

Arizona reference guide

Establish who reviews what

Identify the county’s actual ordinance

Arizona law authorizes qualifying counties to adopt building codes for zoned unincorporated areas, with specified limits and possible area exemptions. Confirm the site’s local code and enforcement status rather than extending a neighboring city’s code to it.

Arizona Legislature: county code adoption

Separate factory-built review

The Arizona Department of Housing provides a plan-review program for factory-built buildings. Its guidance distinguishes off-site closed construction and related compliance documentation; establish how that scope connects to local site approvals.

Arizona Housing: Plan Review

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Arizona

Use this preparation list for Groundbook alongside the official permit checklist.

Site jurisdiction record

Provide the city or county ordinance, adopted editions, amendments, and intake checklist. Mark whether the parcel is incorporated or unincorporated.

Factory and site interface

Where relevant, include approved factory plans and installation information alongside foundations, utility connections, access, and site drawings. Ask reviewers to reconcile their interfaces.

Project-specific criteria

Supply the engineer’s design criteria, civil reports, envelope details, and MEP schedules. Compare notes and values across the documents rather than inferring conditions from the state name.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Arizona plan review FAQs

Can a factory-built plan package stand in for the Arizona site drawings?

Treat the off-site building and the site work as connected scopes. Include both packages, identify the responsible reviewers, and verify foundations, services, and placement against the local requirements and manufacturer’s information.

Which documents should I supply for a Arizona AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and San Francisco

Review the set before you submit

Bring your drawings and the references that govern the project.

Product screenshot