Construction documents · Utah

AI plan review in Utah

Utah’s construction-code statute has dated versions and different code years by discipline. Record the operative version before uploading references so a future statutory version does not become the assumed standard for today’s permit.

Your codes, connected to your drawings

Bring your own code PDFs

Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.

  1. Add your references

    Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.

  3. Review the findings

    Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four California Title 24 code PDFs set to Code and Use as reference, and a drawing set marked Check this file.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs

State and local references

Code references for Utah

Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.

Utah reference guide

Establish who reviews what

Select the operative statutory version

The legislature publishes a version of Section 15A-2-103 effective July 1, 2026 and marked superseded January 1, 2027. Use the version applicable to the project and confirm any permit transition with the authority.

Utah Legislature: Section 15A-2-103, July 2026 version

Include both amendment layers

Section 15A-2-103 incorporates model codes together with Chapter 3 statewide amendments and Chapter 4 local amendments. Its adopted editions differ across disciplines; do not replace this matrix with one generic code-year label.

Utah Legislature: Section 15A-2-103, July 2026 version

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Utah

Use this preparation list for Groundbook alongside the official permit checklist.

Effective-version record

Supply the applicable statutory version, project dates, and code-basis confirmation. Label future January 2027 material separately.

Code and amendment matrix

Bring the model-code PDFs and applicable statewide and local amendments for each discipline. Include the local permit checklist.

Cross-document review set

Supply the code analysis, existing-condition information, energy documents, structural/MEP drawings, schedules, and specifications. Ask reviewers to check references as well as drawing content.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Utah plan review FAQs

Can I use the future January 2027 Utah statute for a September 2026 permit review?

Confirm the governing version for the application. The legislature labels the July 2026 text separately from the future version; future requirements should be treated as a separate study unless the authority establishes their applicability.

Which documents should I supply for a Utah AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and San Francisco

Review the set before you submit

Bring your drawings and the references that govern the project.

Product screenshot