Montana’s certified local programs help determine where a plan review belongs. Identify both the geographic jurisdiction and its authorized disciplines before treating a local permit checklist as the complete review package.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for Montana
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Include Montana’s amendments for the relevant trade scope and confirm the responsible state or certified local program.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
Montana reference guide
Establish who reviews what
Check local certification
Montana’s Building Codes Program states that a city, county, or town may enforce its building code only through a certified program meeting state requirements. Its directory identifies certified jurisdictions and inspectors.
The program explains that local building codes may include only codes adopted by the state program. Confirm the current adopted reference set and which building or trade reviews the local program handles for the project.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for Montana
Use this preparation list for Groundbook alongside the official permit checklist.
Certified-jurisdiction record
Provide the site address, state or certified local reviewer, discipline responsibilities, and applicable submission checklist.
Governing references
Upload the confirmed Montana code basis and relevant amendments. Include agency interpretations or project conditions that affect the work.
Site and consultant coordination
Bring structural criteria, civil access and grading, enclosure details, MEP layouts, and schedules. Ask reviewers to trace site assumptions into the building documents.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Is a Montana local building department’s review scope automatic?
Confirm certification and the applicable discipline responsibilities using the state program’s directory and the local office. A city or county name alone does not establish the complete review scope.
Which documents should I supply for a Montana AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.