A New Mexico review benefits from a discipline-by-discipline reference list. Identify the Construction Industries Division or local review route, then distinguish the building package from separate trade-permit documents.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for New Mexico
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Bring the applicable energy reference and supporting project documents; use the separate residential energy reference where appropriate.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
New Mexico reference guide
Establish who reviews what
Use the New Mexico amendments
CID’s electronic-plan-review page lists New Mexico adopted building and energy codes and separate earthen-material and baled-straw construction provisions. Use the applicable NMAC rules with the model references for the project’s construction method.
RLD’s permit directory distinguishes construction plan review from electrical, elevator, mechanical, and plumbing permits. Confirm the required route and submission documents for each discipline with the responsible authority.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for New Mexico
Use this preparation list for Groundbook alongside the official permit checklist.
CID or local reference basis
Supply the confirmed reviewing office, applicable NMAC code provisions, amendments, and current intake checklist.
Construction-method details
Where earthen or other specialty construction is proposed, include the selected reference rules, assembly details, structural information, and specifications.
Trade and energy coordination
Bring the building set, energy documents, equipment schedules, and trade layouts. Identify separately permitted work and check its interfaces with the architectural and structural design.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Is a New Mexico building-plan review the same package as every trade permit?
RLD lists building plan review and trade permits separately. Confirm each required submission and include the relevant discipline documents in Groundbook when you want their interfaces checked together.
Which documents should I supply for a New Mexico AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.