For Nevada, establish whether the project is under a city or county building department or State Public Works. The state-owned-land review program is a specific jurisdiction, not a universal submission route for private projects.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for Nevada
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Use the applicable Clark County amendment package with its model codes. Confirm the separate local adoption for another Nevada jurisdiction.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
Nevada reference guide
Establish who reviews what
Use the local code record
Nevada NRS 278.580 authorizes cities and counties to adopt building codes and enforcement provisions, subject to statutory limits. Obtain the actual local adoption and amendment documents for the site.
The State Public Works Division describes permit, plan-review, and inspection services for property of the state or held in trust for state government. It publishes its own adopted-code and permit-process resources.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for Nevada
Use this preparation list for Groundbook alongside the official permit checklist.
Property and reviewer
Record ownership or state-property status, the responsible office, adopted references, and the receiving department’s checklist.
Deferred-submission register
Identify deferred systems, required approvals, and the current scope of each package. Include the relevant State Public Works form when that program applies.
Site-to-building evidence
Bring geotechnical and civil information, structural design criteria, envelope details, energy documents, and MEP schedules. Ask reviewers to compare shared assumptions.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Should a private Nevada project use the State Public Works permit portal?
First confirm jurisdiction. The division describes a state-property program; private projects generally need the applicable local authority’s requirements and any separate agency approvals for their scope.
Which documents should I supply for a Nevada AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.