Construction documents · Nevada

AI plan review in Nevada

For Nevada, establish whether the project is under a city or county building department or State Public Works. The state-owned-land review program is a specific jurisdiction, not a universal submission route for private projects.

Your codes, connected to your drawings

Bring your own code PDFs

Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.

  1. Add your references

    Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.

  3. Review the findings

    Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four California Title 24 code PDFs set to Code and Use as reference, and a drawing set marked Check this file.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs

State and local references

Code references for Nevada

Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.

Nevada reference guide

Establish who reviews what

Use the local code record

Nevada NRS 278.580 authorizes cities and counties to adopt building codes and enforcement provisions, subject to statutory limits. Obtain the actual local adoption and amendment documents for the site.

Nevada Legislature: NRS 278.580

Identify State Public Works projects

The State Public Works Division describes permit, plan-review, and inspection services for property of the state or held in trust for state government. It publishes its own adopted-code and permit-process resources.

Nevada Public Works: permits and code enforcement

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Nevada

Use this preparation list for Groundbook alongside the official permit checklist.

Property and reviewer

Record ownership or state-property status, the responsible office, adopted references, and the receiving department’s checklist.

Deferred-submission register

Identify deferred systems, required approvals, and the current scope of each package. Include the relevant State Public Works form when that program applies.

Site-to-building evidence

Bring geotechnical and civil information, structural design criteria, envelope details, energy documents, and MEP schedules. Ask reviewers to compare shared assumptions.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Nevada plan review FAQs

Should a private Nevada project use the State Public Works permit portal?

First confirm jurisdiction. The division describes a state-property program; private projects generally need the applicable local authority’s requirements and any separate agency approvals for their scope.

Which documents should I supply for a Nevada AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and San Francisco

Review the set before you submit

Bring your drawings and the references that govern the project.