Wyoming’s State Fire Marshal plan-review guidance uses building categories and project scope to identify required submissions. Establish that applicability and the local requirements before assigning references to the drawing review.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for Wyoming
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Include the applicable fire reference with the project’s occupancy, life-safety, and fire-protection documents.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
Wyoming reference guide
Establish who reviews what
Confirm the required review category
The State Fire Marshal’s plan-review page lists project categories requiring review, including specified government buildings and site plans for certain parks or similar areas. Match the actual use and work to the current guidance.
The page also publishes adopted-code references. Confirm their effective application with the reviewing office, especially for an older permit, and obtain any separate local or electrical submission requirements.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for Wyoming
Use this preparation list for Groundbook alongside the official permit checklist.
Use, ownership, and reviewer
Provide the occupancy, government ownership or lease information if relevant, state/local review determination, and applicable checklist.
Site and fire-access information
Bring the site plan, access routes, utilities, relevant park or multiple-building layout, and fire-protection scope. Keep building identifiers consistent across sheets.
Building and electrical coordination
Supply structural and MEP plans, electrical distribution information, equipment schedules, and specifications. Identify separate wiring-permit or system submissions and their interfaces.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Does a Wyoming project’s location alone determine State Fire Marshal plan review?
Confirm the building category, ownership or lease status, and proposed work using the office’s current guidance. Also verify the local permit and separate discipline requirements for the actual site.
Which documents should I supply for a Wyoming AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.